Overheated water boiler « Revamping of anaerobic digestion compartments at the treatment plant in North Rome »
Client
ACEA A.T.O. 2 S.p.A., Roma
Contractor
Veolia Water Technologies Italia S.p.A
Scope of work
Supply, construction and installation of two overheated water boiler included pipelines for hot water piping and recirculation of the sludge. Insulations of piping with Rockwool cupels, sp. 50 mm, with a finishing plate in stainless steel AISI 304 sp. 6/10 mm.
Location
Rome